Disciplined Agile (DA) is a framework that provides a pragmatic approach to agile and lean practices within the context of your enterprise. Unlike rigid, one-size-fits-all methodologies, Disciplined Agile recognizes that organizations are diverse and need flexible solutions to navigate the complexities of their unique environments. Developed by Scott W. Ambler and Mark Lines, Disciplined Agile incorporates a range of strategies from various agile and lean approaches, offering a comprehensive toolkit for agile practitioners. It addresses not only the software development lifecycle but also the broader spectrum of activities required for successful product delivery, including solution delivery, IT operations, and enterprise-level governance. The key strength of Disciplined Agile lies in its ability to guide organizations in tailoring their processes to suit their specific needs, fostering collaboration, and ultimately delivering value to their customers in the most efficient and effective way possible.
If you’re intrigued by the possibilities that Disciplined Agile holds for your organization, join us on 8th January at 19:00 CET for an insightful meetup. This is a unique opportunity to delve into the world of Disciplined Agile, connect with like-minded individuals, and gain valuable insights into implementing agile practices at scale. Whether you’re an agile practitioner, a project manager, or a business leader seeking to enhance your organization’s agility, this meetup promises to be a valuable forum for sharing experiences, asking questions, and exploring the transformative potential of Disciplined Agile. Don’t miss out on this chance to be part of a dynamic community dedicated to advancing agile practices and optimizing organizational performance. Mark your calendar and join us for an evening of learning, networking, and inspiration as we navigate the exciting terrain of Disciplined Agile together.
The Product Backlog is an essential tool for Agile software development teams. It is an ordered list of items that represent the features, enhancements, and fixes that the team plans to work on. The Product Backlog consists of Product Backlog Items (PBIs), which are organized based on their priority and level of detail.
PBIs are classified into four types: Themes, Epics, User Stories, and Tasks. Themes are long-term goals or high-level business objectives. Epics are substantial PBIs that need to be broken down into smaller user stories. User Stories are single, meaningful PBIs that can be completed within a sprint. Tasks are the specific tasks required to achieve a user story.
Section 2: Building Your Product Vision and Product Goal
The Product Vision describes the desired future state or result of a product. It sets a clear objective for the development team and stakeholders, guiding their actions and choices throughout the product development journey. The Product Goal represents a target for the Scrum Team to align their planning efforts. It encapsulates the long-term objective that the Scrum Team aims to achieve, emphasizing the need to complete or abandon one objective before pursuing the next.
Section 3: Creating Product Backlog Items (PBIs)
To create good PBIs, you can follow the INVEST acronym, which outlines key characteristics of well-formed and effective user stories. PBIs should be independent, negotiable, valuable, estimable, small, and testable. Each PBI should be self-contained and able to be worked on and delivered separately from other PBIs. PBIs should be open to discussion and collaboration between the development team and stakeholders. Each PBI should deliver value to the customer or end-user. PBIs should be able to be estimated in terms of effort or complexity. PBIs should be small enough to be completed within a single sprint or iteration. Each PBI should have clear acceptance criteria that can be used to verify its successful completion.
Section 4: Checking the Quality of PBIs
The 3C Model provides a framework for creating and refining PBIs. It emphasizes three key aspects: Card, Conversation, and Confirmation. The PBI is represented by a physical or virtual card that captures the essential information about the item. The card serves as a catalyst for a conversation between the development team and the stakeholders, discussing implementation details and clarifying any questions or concerns. The confirmation step involves defining specific acceptance criteria or tests that must be met for the PBI to be considered complete.
Section 5: Balancing the Product Backlog Prioritization
The product backlog prioritization quadrants offer a useful tool for managing and prioritizing the items in a product backlog. The quadrants help the Product Owner and the team strike a balance between different types of backlog items and make informed decisions about their sequencing. The quadrants divide the backlog into four quadrants: new features, architectural innovation, support, and technical debt.
Section 6: Managing the Quality of Product Backlog
The DEEP acronym provides guidance for managing the Product Backlog in Agile software development. The items at the top of the Product Backlog should be detailed enough to provide a clear understanding of what needs to be done. The Product Backlog is not fixed or set in stone and should evolve and emerge as new information and insights become available. Each item in the Product Backlog should have a relative estimation of its effort or complexity. The Product Backlog should be prioritized based on the value and importance of the items.
Section 7: Product Backlog Refinement
Product Backlog Refinement is the process of breaking down and further defining Product Backlog items into smaller, more precise items. It is an ongoing activity to add details, such as a description, order, and size. Refinement sessions should occur at least once per Sprint to ensure the Product Backlog remains current and actionable. The Product Owner, Scrum Master, and Developers can initiate refinement sessions whenever necessary to maintain the Product Backlog’s quality and ensure a shared understanding of the upcoming work.
Agile methodology may not be suitable for projects with many task dependencies. Agile teams work in an iterative manner and focus on delivering value quickly and continuously. However, if there are many dependencies that must be resolved before work can proceed, this can slow down the team’s ability to deliver value quickly. In such cases, other project management methodologies may be more appropriate.
For example, waiting for a lead time of a product can have negative impacts on the agile team’s ability to deliver value in a timely manner.
If an agile team waits for a lead time of a product, it can lead to several consequences. Firstly, it can cause delays in the delivery of the product, as the team is dependent on the lead time of the product before they can proceed with their work. This can lead to missed deadlines and unhappy customers.
Secondly, waiting for a lead time of a product can disrupt the flow of the team’s work. Agile teams work in short iterations, with a focus on delivering value quickly and continuously. Waiting for a lead time of a product goes against this principle and can cause the team to lose momentum and motivation.
Lastly, waiting for a lead time of a product can lead to a lack of transparency and communication between the team and stakeholders. The team may not be aware of the status of the product, which can lead to misunderstandings and miscommunication.
Scrum ceremonies are an integral part of the Scrum framework, which is widely used in Agile software development. They are designed to facilitate communication and collaboration among team members, and ensure that everyone is aligned with the project goals.
However, some people may argue that these ceremonies are a waste of time, as they can be seen as unnecessary interruptions to the actual work that needs to be done. They may feel that these meetings take away from the time that could be spent on actual development work, and that the time spent on these ceremonies is not productive.
Despite these concerns, it is important to note that Scrum ceremonies serve a crucial purpose in Agile development. They provide a structured framework for communication and collaboration, which is essential for the success of any project. By ensuring that everyone is on the same page, and that any issues or concerns are addressed in a timely manner, Scrum ceremonies can help to prevent misunderstandings and delays.
In addition, Scrum ceremonies can actually save time in the long run. By catching problems early on, and addressing them in a timely manner, teams can avoid costly rework and delays down the road. By ensuring that everyone is aligned and working towards the same goals, Scrum ceremonies can help to keep everyone accountable and focused on the tasks at hand.
Overall, while some people may view Scrum ceremonies as a waste of time, it is important to recognize the value that they bring to Agile development. By providing a structured framework for communication and collaboration, these ceremonies can help to ensure the success of any project.
At the core of every successful agile project lies a well-defined product backlog. This list includes all the items that need to be delivered as a part of the solution, and it is typically made up of features, requirements, or user stories. These items are ranked in order of importance to the customer or the business. Think of it like a shopping catalog, where you circle the things you want, but not everything is guaranteed to be delivered.
The product backlog can be stored in a variety of formats, such as a spreadsheet, a requirements management tool, or even a physical list. What’s important is that it’s consistently maintained and adjusted as needed. A well-defined product backlog ensures a smooth flow of work and helps to prioritize tasks in order of business value. It also helps to eliminate unnecessary work by identifying items that are no longer required.
To ensure that your product backlog is well-defined, keep in mind the acronym SMART:
Specific
Each item on the product backlog should be specific and clear, outlining what needs to be accomplished and why it’s important. For example, instead of listing “Improve website usability,” you might list “Reduce the number of steps required to complete a purchase on the website from 5 to 3.” The more specific your item is, the easier it is to determine its relevance and priority.
Measurable
In order to track progress and prioritize work, each item on the backlog should be measurable. This means that you should be able to quantify the work required and estimate how long it will take to complete. For example, you might estimate that reducing the number of steps to complete a purchase will take 2 weeks of development time. By estimating the time required for each item, you can accurately predict the completion date and make more informed decisions.
Achievable
While it’s important to dream big, each item on the backlog should also be achievable within the constraints of your team and resources. Make sure that each item is realistic and can be accomplished with the time and resources you have available. Setting unrealistic goals can lead to frustration and ultimately, project failure.
Relevant
Only items that are relevant to the project’s goals and objectives should be included in the product backlog. This means that each item should be tied to a specific business need or customer problem that needs to be addressed. By keeping the backlog relevant, you can ensure that your team is working on tasks that are aligned with the project’s goals.
Time-bound
Finally, each item on the product backlog should be time-bound and have a clear deadline or target completion date. For example, you might set a goal to complete the website purchase improvement project within the next 3 months. By setting clear deadlines, you can motivate your team and ensure that each item is completed in a timely manner.
By following these guidelines and creating a SMART product backlog, you’ll be well on your way to delivering a successful project. Remember, a well-defined product backlog is an essential part of any successful project, and it ensures that your team is working on tasks that are aligned with your project’s goals and objectives.
In today’s fast-paced business world, it can be tempting to skip the planning process altogether, especially in an Agile environment where change is constant and the future is unpredictable. However, planning is still an essential part of any successful project. It provides a baseline for future discussions, allows for stakeholder input, and helps balance the portfolio of projects.
When creating a roadmap, the team should understand that change is not only possible, but necessary. Any new change should make the plan better, whether that means adding higher priority items, dropping lower ones out, making the plan more achievable or less risky, or better aligning schedules and dependencies. The original plan sets a baseline for future evaluations and discussions. Without a starting point, it’s impossible to know if a suggested change is a good one or not. Having a baseline plan makes it easier to make value comparisons and have healthy discussions.
Another use of a baseline plan is as a communication vehicle to talk about the roadmap with stakeholders. It allows stakeholders to ask their questions at the beginning and see if they can exert influence while there is still time to do so. Being able to start a conversation by recognizing the plan is only a draft invites input and changes at a time when changes are less expensive than later in the process. Using the baseline as a mechanism to have these discussions will be a lot easier than going to each stakeholder group with a blank canvas and attempting to fill it in with each one.
Part of the job of a program or portfolio manager is to create a balanced plan; a portfolio of projects that supports the organizational strategy. To see if a plan has balance, looking at the whole plan is required. Even if each project is solid on its own, it may not be true for the entire collection of projects. Creating a baseline portfolio allows for changes based on the entire plan, not just a single project.
For instance, assume that a portfolio contains ten projects. While all ten of them may anticipate good ROI, or all seem to have solid business cases behind them, it could very well be that isn’t true for the entire collection of projects. For example, while each of the projects are good, few of them have the chance to be spectacular, and none of them have the chance of truly outsized results. This may cause a program manager to make a change to the portfolio, adding in a more speculative and riskier project, and taking out one that has a higher chance of succeeding, but a lower ceiling if it does. On a one-for-one basis, this tradeoff might not make sense, but using a portfolio view, it can be wise. Remember that the goal doesn’t hinge on the outcome of one project, but instead on the collection of all of them.
Planning is still an essential part of any successful project or program, even in an Agile environment. It provides a baseline for future discussions, allows for stakeholder input, and helps balance the portfolio of projects. Skipping the planning process can lead to directionless execution or an inability to correct course mid-stream. Having a plan in place, even a flexible one, is essential for success in today’s business world.
Calculating the cost of a sprint can be a complex task. However, by considering the following factors, we can get a better understanding of how much it will cost to complete a project:
Team size: The number of people working on the sprint will affect the cost. More team members mean higher cost. This is because each team member will require expenditure, and more people working on a project means more expenditure.
Team member rates: Each team member has a different hourly rate, depending on their role and experience level. For instance, a senior developer with years of experience will likely have a higher hourly rate than a junior developer. Therefore, it is important to account for these differences when calculating the cost of a sprint.
Duration of the sprint: The longer the sprint, the higher the cost. This is because more hours will be required to complete the project. Additionally, there may be additional costs associated with a longer sprint, such as increased overhead costs.
Overhead costs: These include expenses such as equipment, software licenses, office space, and utilities. These costs can add up quickly, especially for larger projects. Therefore, it is important to account for these costs when calculating the overall cost of a sprint.
Once we have all of the above information, we can calculate the cost of the sprint by multiplying the total number of hours worked by the team by the hourly rate of each team member. We then add any overhead costs to get the total cost of the sprint.
It is important to keep track of these costs and adjust them, if necessary, to ensure that the project stays within budget. By regularly monitoring the cost of a sprint, we can make informed decisions about how to allocate resources and keep the project on track.
In Scrum, the story point values are typically used to estimate the relative effort required to complete a task, rather than the actual cost in dollars or other currency. However, if the team has a good understanding of the relationship between story points and cost, they may be able to use story points as a proxy for cost when planning and budgeting for a project. This can be especially useful when working on an agile project where requirements are likely to change frequently, as it allows the team to adjust their budget and resources more easily as the project progresses.
How Can We Calculate Project Cost?
In an Agile project, it can be difficult to calculate the cost of a story point directly. However, by tracking the team’s velocity (i.e., the number of story points completed per sprint), we can estimate the team’s average rate of progress.
To calculate the cost of a story point, we need to know the average cost of a sprint. We can estimate this cost by dividing the total cost of a sprint by the number of story points completed in that sprint.
For example, if a sprint costs $10,000 and the team completes 50 story points, the cost per story point is $200 ($10,000 / 50).
Once we have an estimate of the cost per story point, we can use this information to plan and budget for future sprints. By estimating the number of story points required for each feature or user story, we can calculate the approximate cost of implementing that feature or story.
It’s important to note that this method is an estimate, and the actual cost of a story point may vary depending on a variety of factors such as team size, team member rates, and overhead costs. However, by tracking velocity and using historical data to estimate costs, we can make more informed decisions about how to allocate resources and plan for future sprints.
In project management, the critical path is the longest sequence of tasks that must be completed on time to ensure that the project is finished within the scheduled time frame. The critical path method (CPM) is a project management technique that helps identify the most critical tasks in a project and determines the shortest possible time to complete it. The CPM has been around for more than half a century and is still one of the most popular project management techniques today.
Despite the emergence of alternative approaches, such as agile and lean methodologies, critical path analysis remains a fundamental tool for managing complex projects. Some people argue that the critical path method is outdated and no longer relevant in today’s fast-paced business environment. They argue that it is too rigid and inflexible, and that it does not allow for changes or adjustments to be made during the project. However, this is a misconception.
The critical path method is not rigid or inflexible. It is a tool that can be adapted to fit any project, regardless of its complexity or size. When used correctly, the CPM provides a clear understanding of the interdependencies between tasks in a project. It helps identify potential bottlenecks and areas where resources may need to be allocated differently. This level of insight is essential for managing complex projects and ensuring that they are completed on time and within budget.
Moreover, the critical path method is not limited to large-scale projects. It can be used in any project, regardless of size. Even small projects with a limited number of tasks can benefit from the CPM. By identifying the critical path, project managers can determine the most important tasks and allocate resources accordingly.
The critical path method is also valuable for risk management. By identifying the critical path, project managers can determine the tasks that are most critical to the project’s success. They can then focus their attention on these tasks and ensure that they are completed on time. This approach minimizes the risk of delays and ensures that the project is completed within the scheduled time frame.
In conclusion, the critical path method is not dead. It is alive and well in our projects. It remains an essential tool for project managers who want to ensure that their projects are completed on time and within budget. While alternative approaches may have emerged in recent years, the critical path method is still the most effective way to manage complex projects. Its adaptability, flexibility, and focus on risk management make it an invaluable tool for any project manager.
When a team member is not performing well, it can have a significant negative impact on the overall performance of the team. In Scrum, it is essential to address poor performance as soon as possible to ensure that the team can meet its goals and deliver value to the customer.
Managing the poor performance of a team member in Scrum involves a series of steps that are designed to help the team member improve their performance while ensuring that the team can continue to meet its objectives. Here are the steps that can be taken to manage poor performance of a team member in Scrum:
Identify the problem: The first step is to identify the problem. This can be done by analyzing the team’s performance data, observing the team member’s behavior, and getting feedback from other team members. It is essential to understand the root cause of the poor performance to determine the most effective way to address it.
Communicate with the team member: Once the problem has been identified, it is important to communicate with the team member. This can be done through a one-on-one meeting or a team meeting. During the meeting, it is important to clearly explain the concerns about their performance and its impact on the team’s overall performance. It is also essential to listen to the team member’s perspective and understand their challenges, concerns, and feedback.
Set expectations: During the meeting, it is important to set clear expectations for the team member. This includes outlining what is expected of them in terms of their role, responsibilities, and performance. The expectations should be specific, measurable, achievable, relevant, and time-bound (SMART).
Provide support: It is important to provide support to the team member to help them improve their performance. This can include providing training, coaching, or mentoring. The support should be tailored to the team member’s specific needs and should be designed to help them address the root cause of their poor performance.
Monitor progress: After setting expectations and providing support, it is important to monitor the team member’s progress. This can be done through regular check-ins, performance reviews, and feedback from other team members. The monitoring should be ongoing and should be designed to help the team member stay on track and make progress towards meeting the expectations that have been set.
Take action if necessary: If the team member’s performance does not improve despite the support provided, it may be necessary to take further action. This can include reassigning tasks, providing more training, or, in extreme cases, removing the team member from the team. It is important to take action in a timely and respectful manner, and to communicate clearly with the team member about the reasons for the action and the implications for the team.
By following these steps, the poor performance of a team member can be effectively managed in Scrum, ensuring that the team can meet its goals and deliver value to the customer. Managing poor performance is an ongoing process, and it requires a continuous focus on improvement and a commitment to helping team members reach their full potential.
Agile methodology is a popular approach used in software development, which involves iterative and incremental development. It emphasizes on delivering the highest business value in the shortest amount of time.
Two popular charts used in agile methodology are Burn-Down and Burn-Up charts. These charts are essential tools that help teams visualize the progress of their work across iterations or sprints.
Burn-Down charts track the amount of work that remains to be done versus the time remaining. The chart shows a downward trendline, which represents the amount of work remaining. This chart is useful in identifying the team’s progress and helps the team to stay on track with their goals. It also helps the team to identify any potential issues that may arise during the project.
On the other hand, Burn-Up charts track the amount of work that has been completed versus the time remaining. The chart shows an upward trendline, which represents the amount of work completed. This chart is useful in showing the team’s progress and helps to identify whether they are on track to meet their goals. It also helps to demonstrate to stakeholders how much progress has been made and how much work remains.
In summary, the main differences between Burn-Down and Burn-Up charts are the direction of the trend lines. Burn-Down charts show the amount of work remaining, while Burn-Up charts show the amount of work completed. Both charts are useful in tracking progress and providing visibility to the team and stakeholders.
Overall, the use of these charts is an important aspect of agile methodology, as they provide teams with a way to track their progress, identify potential issues, and communicate effectively with stakeholders. By using these charts, teams can stay on track with their goals and ensure that they are delivering the highest business value in the shortest amount of time.
A product owner plays a critical role in ensuring that a project meets the needs of the customers and stakeholders. They are responsible for translating the customer’s needs into actionable tasks for the development team. In addition to this, the product owner must also ensure that the project stays within budget and meets the deadline.
While some may wonder whether having expertise in the subject matter of the project is necessary for the product owner, the answer is no. In fact, having someone too close to the subject matter can hinder the project’s progress. This is because they may get too invested in the details and lose sight of the bigger picture. However, it is still important for the product owner to have a basic understanding of the subject matter to communicate effectively with the team members and stakeholders.
On the other hand, a product owner who maintains a high-level view of the project can ensure that it meets the needs of the stakeholders. They also have the necessary communication skills to interact effectively with the team members and stakeholders. This includes the ability to listen actively, ask questions, and provide constructive feedback.
It is essential for the product owner to prioritize requirements effectively, which means they must have a deep understanding of the product vision. They should be able to identify the most critical requirements, allocate resources accordingly, and set achievable goals. In addition to this, the product owner should also be able to identify potential risks and develop contingency plans to mitigate them.
In conclusion, while subject matter expertise can come in handy, having a product owner who is too close to the subject matter can be a hindrance. Instead, a product owner should have strong communication skills, be able to prioritize effectively, and maintain a high-level view of the project. This will ensure that the project meets the needs of the customers and stakeholders and stays within budget and timeline.
Are you tired of managing projects that seem to drag on forever? Do you feel like you’re constantly putting out fires instead of making real progress? It’s time to try a new approach.
Introducing Scrum for Project Managers, the e-book that will revolutionize the way you approach project management. Our comprehensive guide will teach you everything you need to know about Scrum, an agile project management framework that has been proven to increase productivity, improve communication, and deliver results.
In this e-book, you’ll learn the basics of Scrum, including how to create and manage a product backlog, how to conduct sprint planning and review meetings, and how to effectively communicate with your team. You’ll also discover advanced techniques for improving team collaboration, managing stakeholder expectations, and delivering high-quality products on time and within budget.
Whether you’re a seasoned project manager or just starting out, Scrum for Project Managers is the must-have resource for anyone looking to improve their project management skills. And with our easy-to-read format and practical advice, you’ll be able to start implementing Scrum in your projects right away.
Chapter 1- Scrum Approach
The Agile Manifesto and the Birth of Scrum. 10
Overview of Scrum Framework 12
Scrum Artifacts 14
Organizational Goals in Scrum 16
What is the Backlog? 19
Chapter 2 – Product Backlog
Product Backlog in Scrum 23
An Example of Scrum Practice 25
User Stories 27
Refining and Estimating Product Backlog 30
Chapter 3 – Sprint Backlog
Sprint Backlog 35
Sprint Scope and Sprint Goal 37
Chapter 4 – Definition of Done
Increment and Definition of Done 42
More Details of “Definition of Done” 45
When should the DoD be Prepared? 48
Definition of Done vs. Acceptance Criteria 50
Chapter 5- Scrum Events
What are Scrum Events? 53
What is a Time Box? 55
More Details About The Sprint 57
Sprint Planning Event 59
Why is the Sprint Valuable? 61
What can be Done in the Sprint? 63
How will Things Be Done in the Sprint? 66
Who Attends the Sprint Planning Meeting? 68
Coherency of Sprint Backlog Items 70
Daily Scrum 72
Sprint Review Meeting 74
Sprint Retrospective Meeting 76
Understanding Epics 80
Special Sprints 83
Canceling a Sprint 85
Chapter 6 – The Scrum Team
Scrum Team 88
Scrum Team Size 90
Product Owner 92
What is Value 94
How is the Product Backlog Ordered? 96
The Developers 98
The Scrum Master 100
How does the Scrum Master serve to the Scrum Team 102
What is an Impediment in Scrum? 104
How does the Scrum Master serve to the Product Owner? 106
How does the Scrum Master serve to the Organization 108
Other Titles in Scrum 110
Chapter 7 – Scaling Scrum
Introduction To Scaling Scrum 115
What happens when multiple Scrum Teams work on the same Product? 117
Impact on velocity when scaling Scrum 118
Integrated Product Increments 120
The Definition of Done when multiple teams work on the same Product 122
Must the Sprints be aligned? (same length, same start/end) 124
How many Product Owners are there? 126
Feature teams vs Component teams 128
The importance of creating an integrated Increment 130
Chapter 8 – Terms and Tools Used in Scrum
The Velocity of the Scrum Team 134
Technical debt 136
Functional and non-functional requirements 138
The process of emergence in Scrum 140
Burn-down charts 142
Burn-up charts 144
The “cone of uncertainty” 146
Chapter 9 – Agile Framework and Practices
Agile Framework Overview 150
Kanban 152
Extreme Programming (XP) 155
Test-driven development (TDD) 157
Behavior-driven development (BDD) 159
DevOps 161
Chapter 10 – FAQ about Scrum
Is Documentation Mandatory in Scrum? 165
What happens with incomplete Sprint Backlog items? 167
Who creates the Definition of Done? 168
How to change scope without affecting the Sprint Goal? 170
What happens if there is no Increment and/or the Sprint Goal is not reached? 171
The difference between Product Backlog Refinement and Sprint Planning 173
What is the difference between creating an Increment and Releasing it? 175
About The Author
Gökrem Tekir graduated from Anadolu University in 1997 as an Industrial Engineer.
He worked as a project engineer in different companies in the production and service sector. He earned the PMP Certificate in 2004.
After receiving the PMP Certificate, he continued his career as a Project Management Trainer and Consultant.
Among the trainings he gave, there are topics such as Fundamentals of Project Management, Agile Project Management, Scrum Approach, Project Planning and Follow-up with Microsoft Project, PMP Exam Preparation.
The consultancy services offered by Gökrem Tekir are the Establishment and Integration of Project Management Offices, Microsoft Project Server and Sharepoint Integration, Development of Enterprise-Specific Project Management Methods, Planning and Reporting of Projects Between Buyer and Sellers, Creation and Follow-up of Project Plans of Institutions, Projects of Employees. It is listed as Adapting to Management Methods.
Gökrem Tekir is the author of the first Turkish-language Project Management book in 2006. In 2017, a much more comprehensive work titled “Our Life is the Project – Project Manager’s Handbook” was also published.
Gökrem Tekir continues to share information on social networks such as Youtube, Linkedin, Twitter and Instagram in order to spread his knowledge on project management.